The four scopes — and what each costs
Bathroom pricing only makes sense once you fix the scope:
- Cosmetic refresh — new vanity, toilet, light fixture, mirror, paint, and re-caulk. Same layout, no tile work. Often $3,000–$7,000.
- Mid-range full remodel — new tub or shower, tile floor and surround, vanity, toilet, fixtures, exhaust fan, lighting. Same footprint. Commonly $12,000–$25,000.
- Full gut — everything to the studs, new plumbing and electrical, possible layout tweak, custom tile. $20,000–$35,000.
- Master suite — larger footprint, double vanity, separate shower and freestanding tub, heated floor, custom glass, sometimes moving walls. $30,000–$60,000+.
Where the money goes
Labor is 40–65% of a typical remodel — demolition, plumbing, electrical, tile setting, carpentry, glass, and the general contractor’s coordination. Tile setting in particular is skilled, slow work and a large share of the labor line.
Materials break down roughly as: shower/tub and surround 15–25%, vanity and counter 10–15%, tile 10–20%, toilet and fixtures 5–10%, lighting and fan 3–5%. Where homeowners overspend is usually tile (a designer pattern with lots of cuts and trim pieces) and glass (custom frameless enclosures).
In Port St. Lucie, homeowners planning a full renovation usually get two or three fixed bids from a local bathroom remodeler before committing, since the spread between quotes on the same scope can be several thousand dollars.
Bathroom remodel cost by scope (2026)
| Scope | Standard bath (35–60 sq ft) | Large / master bath | Timeline |
|---|---|---|---|
| Cosmetic refresh | $3,000 – $7,000 | $6,000 – $12,000 | 3 – 5 days |
| Mid-range full remodel | $12,000 – $25,000 | $20,000 – $35,000 | 2 – 4 weeks |
| Full gut to the studs | $20,000 – $35,000 | $30,000 – $50,000 | 3 – 5 weeks |
| Master suite with layout changes | — | $40,000 – $60,000+ | 5 – 8 weeks |
Figures include labor, materials and permit for a licensed remodel. Moving plumbing in a slab home adds $1,500–$4,000.
What moves the price in Florida
- Slab plumbing. Moving a drain in a concrete-slab home means cutting and re-pouring the slab — a real line item. Keeping fixtures where they are saves the most money of any single decision.
- Moisture-rated materials. Proper waterproofing membranes, mold-resistant board and quality exhaust ventilation cost more up front and are not the place to cut in a humid climate.
- Permits and inspections. A full remodel in Port St. Lucie is permitted work; budget for the permit and the inspection schedule, and be wary of any contractor who suggests skipping it.
- Second-story bathrooms add labor for material handling and extra care on waterproofing.
Where you can save without hurting resale
Keep the existing layout. Choose a quality stock vanity over custom. Use a large-format porcelain tile that covers area fast with fewer grout lines. Pick a semi-frameless glass door instead of full custom frameless. Splurge only on the things you touch every day — the shower valve, the faucet, the toilet — and keep the rest mid-grade.
Frequently Asked Questions
Figures on this page are 2026 Florida-region ranges gathered for planning purposes only. Confirm pricing with itemized quotes for your own property before you commit a budget.